How Long Does It Take to Make and Install a Sign?

The honest answer is: it depends. A sign project is a chain of stages, and the total time is the sum of all of them. Knowing the stages helps you plan, especially if you have an opening date.

The stages

  1. Design and mockup. You share your logo and idea, review a mockup and request changes until you are happy.
  2. Landlord approval. If you lease, the property manager reviews the design first.
  3. Permits. The city reviews the application. This is often the longest and least predictable stage.
  4. Fabrication. The sign is built once the design is approved. Production can often overlap with permitting.
  5. Installation and inspection. The sign is installed, wired if lit, and inspected where required.

What can speed things up

  • Ask for your landlord's sign criteria on day one.
  • Send your logo as a vector file.
  • Decide on the mockup quickly.
  • Start the permit process alongside design and production where possible.
  • Tell your sign company your target date at the start.

What can slow things down

  • Late changes after the design is approved
  • Incomplete landlord or city paperwork
  • Signs that need engineering, such as monuments and pylons
  • Electrical work that needs scheduling

Planning a grand opening? Tell us your date up front. We will say honestly what is realistic and plan the schedule around it.